An investment site for production purposes of 1.8 hectares
General
Total area
18000
Type of site
Greenfield
The format of the site
Land plot
Land category
Industrial lands
Municipal formation
Tutaevsky district
Form of ownership
undefined
The form of the transaction
rent
The cost of the object, RUB.
not installed ₽
Infrastructure
Infrastructure
Transport accessibility: in close proximity to the railway station Tutaevo, 0.1 km. The distance to Yaroslavl-Glavny railway station is 32 km. Distance to the motorway
Water supply
No
Consumption tariff (water supply), RUB/cubic meter
38,66
Drainage
No
Consumption tariff (wastewater disposal), RUB/cubic meter), RUB/ton
32,47
Transportation tariff (drainage), RUB/cubic meter
single tariff (cleaning and transportation)
Gas supply Availability
Yes
Electricity Availability
No
The average energy price for the reporting year (1 CC, up to 670 kW, RUB./MWh, legal entities)
9715,57 ₽
Heat supply Availability
No
Heat supply Consumption rate, RUB/Gcal*h
2930,05
Export of MSW
Yes
Export of MSW (tariff), RUB/cubic meter
584,3
Access roads
Information is missing: not enough data
Contact the facility administrator
Contact person's phone number, e-mail
+7 (48533) 7-08-59; gromova@tr.adm.ysr.ru
Website