The investment site is 0.91 ha
General
Cadastral number of the storage unit
76:19:010320:1766
Total area
9057
Type of site
Greenfield
Land category
Lands of settlements
Municipal formation
Rostov region
Form of ownership
municipal
The form of the transaction
rent, subsequent purchase
The cost of the object, RUB.
Cadastral value 25,895,683,83 ₽
Infrastructure
Infrastructure
Electricity: from the existing substation ZTP10/0.4 kV with a capacity of 1260 kVA, free capacity of 126 kVA (after completion of construction of additional transformer substations 10/0.4 kV with a capacity of 126 kVA) from the transformer substation PS Rostov 130/35/10 kV. The distance from the connection point is 700 m. Gas supply: from the Rostov gas distribution station. The distance of the connection point is 500 m. Water supply: from the water supply networks of 2 microdistricts with a diameter of 200 mm. The distance of the connection point is 396 m. Drainage: It is necessary to build a sewage pumping station KNS-6 "MKR-3" with an inset into the pressure collector of drainage under construction with a diameter of 630 mm. The distance of the connection point to the projected KNS-6 is 490 m. Storm drain: no. Telecommunications: There is a technical possibility of connection.
Water supply
No
Drainage
No
Gas supply Availability
No
Electricity Availability
No
Heat supply Availability
No
Export of MSW
Yes
Export of MSW (tariff), RUB/cubic meter
clarification during the implementation of the project
Access roads
Yes
Railway availability
No
Availability of truck parking, yes/no
no
Contact the facility administrator
Contact person
Kulkova Elena Vladimirovna, Head of the Economic Development Department of the Economics Department of the Rostov Municipal District Administration
Contact person's phone number, e-mail
+7 (48536) 6-12-41, econ@rostov.adm.yar.ru
Website