Construction and metal processing plant
Project assumptions
- According to Jaroslavlstat, manufacture of manufactured metal products other than machines and equipment increased by 25.8 per cent in the Yaroslav region in 2024, compared with 2023
- Possibility of co-operation with the PAO OCD-Saturne, the Yaroslava Metals Plant, the Métallical Designs Department, the Steel Design OO
Key object parameters
Project cost 750 Million rubies.
Location
Address Yaroslav region, Rybin district, Makara Rural District
Cadastral number near the post. Jubilee, bordering land from 76:14:010504:118; 76:14:010504:16
Area 27.5 ha
Land category Human settlements
Type of permitted use Productive activities
Location benefits
- The competitive advantages of this investment site are its logistics location, the existence of a large area of land, which allows the enterprise itself and the administrative buildings in its territory.
- Jaroslav region, one of the major transport nodes in the central part of the Russian Federation
- P. Jubilee ' s roads are linked to Moscow and the Yaroslavlem Regional Centre
- Regional roads are passing through the area: Sergiev Posada-Kaljazin-Rybinsk-Cherepovec-P-104
| Yaroslava Regional Liing Company | ♪ Lizing - production equipment, medical equipment, processing and storage equipment from/h ♪ Equipment value between 0.5 and 100 million roubles ♪ Rate - 12 per cent for Russian equipment, 16 per cent for foreign equipment, 10 per cent for equipment produced and operated in the Yaroslav region |
| Free rent | lease rate 0.069 per cent of the cadastral value of the site |
Up to 5 million roubles 1⁄2 key rate of the Bank of Russia as at the date of the loan contract + 4 per cent*orphanage (per year) Investment activities at the rate of 1(1/2) key rate of the Bank of Russia as at the date of the loan contract + 3 per cent |
Contact the administrator
Telephone
+74852230230
E-mail
corporation@invest76.ru