The land plot for the construction of production facilities is 10.2 hectares
General
Total area
102000
Type of site
Greenfield
The format of the site
Land plot
Municipal formation
Rybinsk district
The form of the transaction
rent, sale
Infrastructure
Infrastructure
distance from the administrative center - to the city of Rybinsk 7 km; distance from the villageKosterino – 500 m; distance from the nearest freight railway station - 8 km; distance from a highway-type road 0.5 km; the possibility of arranging an exit is available; Distance from the pier / river port 8 km; distance from the nearest fire station – 11 km There is a possibility of connection. Power supply – centralized Water Supply – local Sewerage - local Gas Supply- no Heat supply - local
Drainage
It is possible to connect
Gas supply Availability
It is possible to connect
Electricity Availability
It is possible to connect
Heat supply Availability
It is possible to connect
Contact the facility administrator
Contact person
Stepina Victoria Vladimirovna, Deputy Head of the Revenue and Economic Development Department of the Department of Economics and Finance of the Administration of the Rybinsk Municipal District
Contact person's phone number, e-mail
+7 (4855) 22-26-24