Investment site 9.9 ha (Revolyutsii, 35)
General
Total area
99457 sq.m.
Cadastral number of the storage unit
76:20:070809:58
Type of site
Greenfield
The format of the site
Land plot
Land category
Lands of settlements
Municipal formation
G.O.G. Rybinsk
Form of ownership
undefined
The form of the transaction
rent through auction
Description
Type of permitted use
Energy industry
Infrastructure
Infrastructure
Drainage (The connection point for the discharge of wastewater from the facility is an existing well on a sewer collector Ø 700 mm passing through the ave. Revolutions along railway tracks (coordinates: X 1262645;Y 421896). The maximum load is 10 cubic meters/day),Water supply (The connection point is the existing chamber on the Ø600 mm water pipe running along the ave. Revolutions along railway tracks (coordinates: X 1262614;Y 421921). The maximum load is 10 cubic meters /day), Gas supply (The connection point is a high–pressure gas pipeline laid along Revolution Avenue, the distance is about 0.4 km. The maximum consumption of natural gas on the site is 30 m3/hour), Electricity supply (Complex construction of 6.0 kV and 0.4 kV electric networks is necessary. It is also necessary to provide a place for the installation of a transformer substation and corridors for laying 6.0 kV and 0.4 kV cable lines)
Water supply
Yes
Drainage
No
Gas supply Availability
Yes
Electricity Availability
No
Heat supply Availability
Yes
Heat supply Consumption rate, RUB/Gcal*h
2163
Access roads
No
Railway availability
Yes
Availability of truck parking, yes/no
Yes
Contact the facility administrator
Contact person
Irina Serova, Head of the Privatization and Control Department of the Rybinsk City District Administration
Contact person's phone number, e-mail
+7 (4855) 20-44-74 ext 212