Enterprises have access to new equipment under the National Project

To develop the Regional Engineering Centre at the initiative of the Governor of the Jaroslava Region, funds have been allocated for the purchase of additional equipment: a vertical-Freser processing centre with the PPS and an electro-Erosion wire-out machine.

♪ The equipment was designed to provide metal processing services for the entrepreneurs of the region, and was presented by Alexander Eduardovic Olkhov, Minister of Investment and Industry of the Jaroslava Region. - The procurement procedures have been completed and the production site in Tutaev has been equipped with an electrical wire and wire plug that will be introduced in early June after completion of the start-up work.

Electricity machines are designed to process parts and components with complex geometry, maintaining a high level of accuracy of surface layer size and purity. Such processing is widely used for many important operations in the production of stamps, press, stationery and measuring beds. Equipment is also used in various industries - aerospace, automobile, micro-electronic, etc.

The supply of the market will enable the Regional Engineering Centre to significantly unload existing equipment and to help a larger number of enterprises, thereby reducing the completion time by 30 per cent.

In 2023, the Regional Centre for Engineering provided integrated services to 30 field enterprises. Services include: product design services, technology cassettes for SME entities; the development and manufacture of non-standard equipment, process beds, separate nodes and parts; the automation and upgrading of existing equipment; international enterprise certification; the development of PPE master ' s programmes; business plans and many others.
This year, eight enterprises received support.

Support is provided through the national project " Small and Medium Enterprise " initiated by the President of Russia.
Support may be sought on rci-76.ru or by telephone: 8 (4855) 231-601

Back