Open selection of part of acquisition and process connection costs to electric power stations

Grants are granted to Russian organizations for the purpose of operating permanent current electric charge stations

In 2025, subsidies are allowed CostGrants by recipients 2025.


What can you get?


Dimension of subsidies for the charging infrastructure facility as a separate permanent current electrical charge station:

  • purchases the equipment is determined in the amount 60 per cent of actual costs incurred The recipient of the subsidy for the acquisition of equipment of a separate permanent current electric charge station, but not more than the grant;
  • Technological Accession to electrical grids 60 per cent from the actual costs incurred by the recipient of the technology accession grant to a separate permanent current electric charge station to electrical networks, but not more than the grant.

Amount of subvention for the charge infrastructure facility executed as Group separate permanent current electrical charge stations:

  • purchases The equipment is defined for each separate permanent current electrical charge station in the group 60 per cent from the actual costs incurred by the recipient of the acquisition grant, but not more than the grant;
  • Technological Accession to electrical grids 60 per cent from the actual costs incurred by the recipient of the technology accession grant to the charge infrastructure facility as a whole, but not more than the grant.

Calculation of grants

  • for recipients of VAT payments based on documented costs, excluding VAT;
  • For grantees who are not VAT contributors or who have been exempted from responsibilities related to VAT calculation and payment, based on documented costs based on VAT.


    The actual costs of the grantee should be documented.


Application for selection can be made on the State Industrial Information System website up to 24.10.2025

Details of support Reference to application