General
Total area
933000
Type of site
Greenfield
The format of the site
Land plot
Land category
Industrial lands
Municipal formation
Tutaevsky district
Form of ownership
undefined
The form of the transaction
rent
The cost of the object, RUB.
not installed ₽
Infrastructure
Infrastructure
Transport accessibility: in the immediate vicinity to the railway line 1 km, to the junction railway station in Yaroslavl 39 km. Water supply: not available. Drainage: none. Power supply: in the immediate vicinity of the power line at 440m. Gas: not available.
Water supply
No
Consumption tariff (water supply), RUB/cubic meter
59,83
Drainage
No
Consumption tariff (wastewater disposal), RUB/cubic meter), RUB/ton
19,75
Transportation tariff (drainage), RUB/cubic meter
great distance from the network
Gas supply Availability
No
Electricity Availability
No
The average energy price for the reporting year (1 CC, up to 670 kW, RUB./MWh, legal entities)
9715,57 ₽
Heat supply Availability
No
Heat supply Consumption rate, RUB/Gcal*h
2930,05
Export of MSW
Yes
Export of MSW (tariff), RUB/cubic meter
584,3
Additional information
Support measures
Set of investment rules
Tariffs
Name of the owner
non-delimited state property
Administrator of the investment platform
Administration of the Tutaevsky municipal district
Contact the facility administrator
Contact person's phone number, e-mail
+7 (48533) 7-08-59; gromova@tr.adm.ysr.ru
Website
Contact the administrator
Back